Third Quarter 2007

Posted on 30/09/2007

Highlights:

Africa

BOTSWANA – KIHABE BASE METALS PROJECT

Diamond core assays continue to give higher grades compared with those received from RC drilling and used in the initial Kihabe resource calculation.

A dual purpose RC/diamond core rig is currently drilling at Kihabe and completed 12 holes during the quarter, totalling 1,755m.

A gossan discovered during the quarter, 10km south of the Kihabe resource, returned grades from six rock samples as follows:

Zinc ranging from 7.89% to 21.95%
Lead ranging from 3.93% to 7.63%
Silver ranging from 2.35 oz/t to 20.58 oz/t

namibia – tSUMKWE bASE mETALS pROJECT

1,120 geochemical samples were taken during the quarter to test that portion of the Kihabe zone of mineralisation that extends into Namibia.

namIBIA – Hardap Diamond Project

The Company has been awarded four Exclusive Prospecting Licences for precious stones in the Hardap region of Namibia, which covers an area of known kimberlites.

Australia

WESTERN AUSTRALIA – TELFER GOLD pROJECT

During the quarter the Company continued with joint venture negotiations on its Telfer project.

Quarterly Reports