2006
31/12/2006
Highlights:
Africa
BOTSWANA - KIHABE ZINC PROJECT
2,562 metres of RC resource infill drilling were conducted
during the quarter on the 2.4km long Kihabe zone of zinc,
lead, copper, silver and vanadium mineralisation.
The...
30/09/2006
Highlights:
Africa
BOTSWANA – KIHABE BASE METALS PROJECT
5,899 metres of RC resource infill drilling were conducted
during the quarter on the 2.4km long Kihabe zone of zinc,
lead, copper, silver and vanadium...
30/06/2006
Highlights:
Africa
BOTSWANA – KIHABE BASE METALS PROJECT
2,334 metres of drilling were conducted during the quarter
on the southwest portion of the 2.4km long Kihabe zone of
mineralisation. Mineralised zones intersected in...
31/03/2006
Highlights:
Africa
BOTSWANA – KIHABE BASE METALS PROJECT
Reverse Circulation infill drilling commenced in March to
upgrade the 2.4km long Kihabe zone of zinc, lead and silver
mineralisation which also contains copper and vanadium
credits,...