2006

Fourth Quarter 2006

31/12/2006 Highlights: Africa BOTSWANA - KIHABE ZINC PROJECT 2,562 metres of RC resource infill drilling were conducted during the quarter on the 2.4km long Kihabe zone of zinc, lead, copper, silver and vanadium mineralisation. The...

Third Quarter 2006

30/09/2006 Highlights: Africa BOTSWANA – KIHABE BASE METALS PROJECT 5,899 metres of RC resource infill drilling were conducted during the quarter on the 2.4km long Kihabe zone of zinc, lead, copper, silver and vanadium...

Second Quarter 2006

30/06/2006 Highlights: Africa BOTSWANA – KIHABE BASE METALS PROJECT 2,334 metres of drilling were conducted during the quarter on the southwest portion of the 2.4km long Kihabe zone of mineralisation. Mineralised zones intersected in...

First Quarter 2006

31/03/2006 Highlights: Africa BOTSWANA – KIHABE BASE METALS PROJECT Reverse Circulation infill drilling commenced in March to upgrade the 2.4km long Kihabe zone of zinc, lead and silver mineralisation which also contains copper and vanadium credits,...