June 2008

Posted on 30/07/2008

HIGHLIGHTS

 

KIHABE ZINC/LEAD PROJECT, BOTSWANA

NXUU ZINC/LEAD DEPOSIT

During the quarter resource drilling commenced at the Nxuu deposit, 7 kms east of the Kihabe zinc/lead resource.  The drilling delineated an area of 220,000m2 of the geological basin containing flat lying quartz wacke, host to zinc/lead mineralisation.  The quartz wacke is covered by 1 - 6m of Kalahari sands and on average is estimated to be between 30 – 40m thick. Core is currently being cut and results are pending.

KIHABE ZINC/LEAD RESOURCE

Results from 41 diamond core drill holes amounting to 5,380m are currently being incorporated into the Kihabe resource model for the purpose of upgrading the resource estimate

 

TSUMKWE BASE METALS/DIAMOND PROJECT, NAMIBIA

BASE METALS

Results from two diamond core holes drilled during the quarter into a strong geochemical Zn/Pb anomaly, are pending.

DIAMONDS

One potential kimberlite target was drilled during the quarter.

 

TELFER

COPPER RESOURCE

The Company has estimated an Inferred Resource of 6 million tonnes @ 0.47% copper to a depth of 130m, using a 0.2% external cut-off, for 28,000 tonnes of contained copper metal, at the Camp Dome deposit Telfer, over which the Company has an Exploration Licence Application.

 

Download Report

Download the Adobe Acrobat PDF file of this report:

Adobe Acrobat PDF fileQ6740 (767 KB)